Patrinely Group and USAA Real Estate have topped out their project Block 162, a 606,000-square-foot office building located at 675 15th St. between Welton and California streets in downtown Denver.
Construction is slated for completion in December 2020, with first occupancy for tenants available as early as January 2021.
When complete, the 30-story class A office building will include 20 floors of office space on Levels 11–30. The average floorplate size will be 29,800 rentable square feet and will have no interior columns within the office floor plates. The building will include more than 9,000 rentable square feet of groundfloor retail in three retail lease spaces.
The office building will feature an 11th floor amenity area dedicated exclusively to the building’s tenants, with a fitness center, social lounge, and conference and meeting space.