Publications

WattEV debuts largest public heavy-duty charging depot in the U.S.
Other - JULY 28, 2023

To read this full article you need to be subscribed to Newsline.

Sign in Sign up for a FREE subscription

WattEV debuts largest public heavy-duty charging depot in the U.S.

by Kali Persall

WattEV, a commercial-truck charging infrastructure developer, has unveiled the largest charging station of its kind in the United States for electric heavy-duty trucks at the Port of Long Beach (POLB).

Located directly adjacent to the Pier-A terminal in the Port of Long Beach (POLB), the WattEV POLB Depot will serve as the southern anchor of WattEV’s planned electric-truck charging freight corridor, connecting heavy-duty electric trucks with routes to inland destinations throughout Southern California.

The site features 13 chargers with the ability to charge 26 trucks concurrently, with 5 megawatts of power provided by Southern California Edison. WattEV plans to add megawatt charging at the depot that will allow pass-through trucks to be charged in 20 minutes, according to Salim Youssefzadeh, co-founder and CEO of WattEV.

WattEV has been working on opening four depots in California throughout the past few years, including warehouse districts in Gardena, inland

Forgot your username or password?