Publications

Investors - JANUARY 30, 2020

To read this full article you need to be subscribed to Newsline.

Sign in Sign up for a FREE subscription

International consortium signs Dutch canal bridge

by Andrea Zander

An international consortium has signed a Dutch motorway contract, The ViA15 project, which involves extending the A15 motorway in the Netherlands by 12 kilometers (7 miles) and carrying out 23 kilometers (14 miles) of widening work along the A15 and A12, along with the 2.5 kilometer-long (2-mile) bridge over the Pannerdensch Canal.

Rijkswaterstaat, the operational arm of the Dutch Ministry of Infrastructure & Water Management, has appointed the GelreGroen consortium to carry out the contract, which covers design, construction, finance, operation and maintenance. The GelreGroen consortium is made up of Hochtief (40 percent), John Laing (40 percent), Dura Vermeer (10 percent) and Besix (10 percent). The project design, construction and maintenance works will be executed by a consortium consisting of Hochtief (25 percent), Dura Vermeer (25 percent), BESIX (25 percent) and Van Oord (25 percent).

The work is scheduled to start by the end of 2020.

Forgot your username or password?