GreenVolt, through its subsidiary V-Ridium, a utility-scale renewables developer, is planning to break ground on a 50-megawatt wind portfolio in Poland.
The 15.4-megawatt Podlasek and 34.5-megawatt Wólka Dobryńska projects are expected to be operational by the end of 2022 and result from the third auction carried out by the Polish authorities.
Vestas has been chosen to supply the turbines for both parks and handle their maintenance for a period of 30 years.
Greenvolt has a 2.8-gigawatt pipeline of renewable energy production projects in Poland, Romania and Greece.