Publications

DWS strengthens infrastructure portfolio with onshore wind farm acquisition in Finland
Transactions - MARCH 6, 2026

To read this full article you need to be subscribed to Newsline.

Sign in Sign up for a FREE subscription

DWS strengthens infrastructure portfolio with onshore wind farm acquisition in Finland

by Released

DWS Group, a European asset manager with global reach, has acquired Maaselänkangas, an onshore wind farm in Oulainen, Finland, on behalf of its European infrastructure investment strategy. The asset was acquired from wpd Group for an undisclosed sum.

Located in the municipality of Oulainen in the North Ostrobothnia region, approximately 35 kilometers east of Kalajoki, the wind farm has an installed capacity of 41.3 megawatts and has been operational since September 2024. The facility comprises seven Nordex wind turbines and is expected to generate an annual net energy output (P50) of approximately 128.6 gigawatt hours.

The fully operational asset no longer carries construction risk and is expected to generate stable cash flows from the first day of operation. Its technical design meets modern European onshore wind standards and includes an anti‑icing system to optimize performance under cold-climate conditions. Grid connection is provided via an approximately fiveâ€

Forgot your username or password?