Enel Green Power has started construction of the Lily solar + storage project, its first hybrid project in North America that integrates a renewable energy plant with utility-scale battery storage. By pairing the two technologies, Enel can store energy generated by the renewable plants to be delivered when needed, such as to help smooth the supply of electricity to the grid or during periods of high electricity demand. In addition to the Lily solar + storage project, Enel plans to install approximately 1 gigawatt of battery storage capacity across its new and existing wind and solar projects in the United States over the next two years.
Located southeast of Dallas in Kaufman County, Texas, the Lily solar + storage project comprises a 146 MWac photovoltaic (PV) facility paired with a 50 MWac battery and is expected to be operational by summer 2021.
Lily’s 421,400 PV bifacial panels are expected to generate over 367 GWh each year, which will be delivered to the grid an